survey method
Before an EPC is issued a site visit will be arranged to suit the client and one of our Assessors will travel to your property. The inspection should take between 45 minutes and 1 hour and will cause the minimum of disruption. The only important factor to be aware of is that our Assessor will need to have access to the loft space and your boiler.
An internal and external inspection of the property is carried out for the purpose of producing the EPC.
Download our terms & conditions (pdf 54kb)